G6_project
Μελέτη και κατασκευή κτιρίου έξι (6) διαμερισμάτων ενεργειακής κλάσης Α+.Θέση Γέρακας ΑττικήςΚατασκευή 2024-2025Επιφάνεια 735.00τ.μ.
Μελέτη και κατασκευή κτιρίου έξι (6) διαμερισμάτων ενεργειακής κλάσης Α+.Θέση Γέρακας ΑττικήςΚατασκευή 2024-2025Επιφάνεια 735.00τ.μ.
Mekacons Company, in collaboration with the architectural firm Aeter, has undertaken the reconstruction and decoration of the existing shades and pergolas at Astir Beach shoreline – restaurant APLO. Our team installed new iron structures, various shading and roofing systems, sound, lighting, natural ventilation, and mobile decorative elements throughout the entire area of the new bar,…
MEKA Constructions has been hard at work in recent times, bringing to life the completion of a cutting-edge project – the construction of an expansive 1.700M2 H&M store in the vibrant area of Smart Park Outlet , Attica. The project encompassed a comprehensive rebuild of the two levels of the store across four distinct phases,…
Plan and construction of a building of six (6) apartments with basement, ground floor, A+B floor with roof, energy class A+. Location Gerakas Attica Construction 2022 Area 690.00sq.m.
Plan and total renovation of a 83 sqm apartment with furniture package ιn Halandri – Attica
Plan and total reconstruction of a 12-apartment building with a swimming pool. Location Attiki 2020 construction Area 870.00sq.m
Plan and total renovation of a 55 sqm apartment with furniture package in Voula – Attica.
Μελέτη και κατασκευή υφιστάμενου κτιρίου σε χώρο γραφείων και καταστημάτων Θέση Κεραμικός – Αθήνα Κατασκευή 2021 Επιφάνεια 750.00τ.μ
Plan and construction of a building of six (6) apartments with basement, ground floor, A+B floor and roof. Location Gerakas Attica Construction 2021 Area 680.00sq.m.
Construction of a multistoried building with 11 apartments with basement and attic Location Athens Construction 2022
MEKA constructions worked to complete an overhaul of an existing branch of H&M in Athens Metro Mall. Our work included the complete rebuild of the store in phases over 12 weeks, while the store remained opened for its operation. Area 1250.00sq.m.
Reconstruction of parts of the beach and construction of a part of Matsuhisa restaurant. Location Astir – Vouliagmeni Construction 2022